Shift handover
What happened, what's still broken, what the next shift needs. Read and confirmed.
Replaces the notebook with the coffee ring.
The rest stay out of the way, like a good contractor.
What happened, what's still broken, what the next shift needs. Read and confirmed.
Replaces the notebook with the coffee ring.
Raise a problem in two taps; it climbs a ladder until someone answers.
Escalation without the shouting.
Plan against count every hour, with the reason and minutes for each miss.
Every hour accounted for, even the one before lunch.
From the counts and stops the floor already enters, changeovers included.
OEE without a twelve-month PLC project.
Audit layers, question pools that rotate, a schedule read from standard work.
Every question comes round eventually. Like the auditors.
Designed forms with photos; findings become actions.
Go and see, then write it down somewhere other than your hand.
Routes of checkpoints (eyewash stations, extinguishers, machine checks), walked stop by stop.
The extinguisher has been checked. Actually checked.
Scored audits by area, on a radar and on the map.
Sort, set, shine, standardise, sustain, screenshot.
Routines with checklists, completions and adherence.
Standard work for the people who write standard work.
Who can run which station this shift, sign-offs in four levels, and where you're one holiday from trouble.
Learn the only filler operator is off before the filler does.
Each floor laid out, with calls, checkpoints and line states where they happen.
A "you are here" that's right.
One action list across every module: owners, re-plans with a reason, and a check that it worked.
Closes the problem, not just the ticket.
Tier meetings with letters, roll call, issues and escalation up the tiers.
Tier meetings that end on time. Results not guaranteed.
Is / Is not, fishbone, 5 Whys, 8D and an A3 view.
Five whys. Six on a Monday.
Ideas from the floor, with who's on it and what came of it.
The suggestion box, minus the box.
DMAIC, Kaizen, PDCA and just-do-its, with phase checklists, gates and savings a validator signs off.
Savings finance actually signed. The rarest thing in Lean.
Strategy deployment and the X-matrix.
The X-matrix your consultant drew, now with owners.
Metrics that roll up across sites, scorecards, the monthly pack, and feeds from your other systems.
Rates are never averaged. We're not animals.
Control charts, signals and capability.
Your process, out of control in real time.
Gauge studies and their verdicts.
Is it the part, or the gauge? Now you'll know.
Process FMEAs with control plans, tied to the same characteristics as SPC and MSA.
Severity 9, occurrence 2, detection: this page.
Characteristics, their specs and Ppk targets in one place.
One fill weight, not four.
Standing lists of actions, reviewed on a cadence.
The list rolls. The deadlines, less so.
Say thank you, on the record.
Applause, minus the awkward bit.
What fell due and what was done, by unit, never by person.
Accountability without the blame.
See them working together.